Tangshi의 공업 지대, Gaobu 도시, 둥관 시 광동성, 중국 | bella@zehuimach.com |
원래 장소: | 광동 중국 (본토) |
브랜드 이름: | ZHMACH |
인증: | CE Certificate |
모델 번호: | ZHFH-1650/2150 |
최소 주문 수량: | 한 세트 |
---|---|
가격: | inquiry |
포장 세부 사항: | 종이와 영화, 나무로 되는 케이스 |
배달 시간: | 30 일 |
지불 조건: | L / C, T / T, 웨스턴 유니온 |
공급 능력: | 달 당 1 세트 |
차원 (L*W*H): | L2500*W8300*H1500mm | 최대 권선 물자 폭: | W1650/2150mm |
---|---|---|---|
조건: | 새로운 | 전압: | 380V |
중량 :: | 950kg | 권선 물자 속도: | 50m/min |
힘 (W): | 0.75kw | 판매 후 서비스 제공: | 엔지니어 서비스 기계 해외 수 |
제품 유형: | 거품 그물 | 보증: | 일년 |
Measuring length For Roll Sponge High Precision Coil Stock Measure Machine
To measure a variety of fabrics,including foam,cloth
The primary purpose is to measure a variety of fabrics,including foam,cloth and pack them into finished product.
model |
QHFH-1650
|
QHFH-2150 |
Reel material width max | 1650mm |
2150mm
|
Reel material speed
|
50m/min
|
50m/min |
Machine weight
|
950kg | 1000kg |
Power
|
0.75kw | 0.75kw |
Machine external size | L2500 * W8300 * H1500mm |
L3000 * W800 * H1400mm
|
Marks:
|
|||||
1. According to seller's standard designed drawing diagrame to arrange the production and inspection.
|
|||||
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer.
|
|||||
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shippment (The bank charge for buyer's account).
|
|||||
4. Delivery forms: Send to ShenZhen Seaport
|
|||||
5. Spare parts: Offer assorted maintain tools.
|
|||||
6. Package: paper & film package.
|
|||||
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%)
|
|||||
8. Delivery date: 45 days (after seller get the advance).
|
|||||
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account.
|
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1 engineer help to install the machine you must send someone to help about 2 days installation will finished and the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q: What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q: During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some pictures we will help to handle within 24hours.
담당자: Wang
전화 번호: 0086-15817646348
130KW PE 거품 순수한 만드 기계, EPE는 거품 제조 설비를 자루에 넣습니다
기계, 시멘스 변환장치를 가진 저압 폴리우레탄 거품 기계를 만드는 EPE 거품
시멘스 변환장치를 가진 자동적인 기억 폴리우레탄 갯솜 생산 라인
폴리스티렌 매트리스를 위한 가동 가능한 갯솜 생산 라인/지속적인 거품이 이는 기계
자동 갯솜 원형 수평한 거품 절단기/CNC 거품 절단기 기계
스펀지 매트리스, Cnc EP 절단기를 위한 산업적 수직 거품 커터